Base stage completed

My last visit home between community visits was a short one, enough time to throw my clothes into the washing machine before repacking back into my bag and a quick confab with hubby and the builder over building issues.

It was pleasing to see the stumps were all in as well as the bearers and joists down as well as some of the structural posts for the garage and main house, now it really looks like the house takes up the full block.

The house is now at base stage. All the stumps,bearers and joists are in. Also some of the posts for the carport and house structure.

The builder had a bit of trouble with the concrete pour for the stumps. Due to our unseasonably high rainfall this year, the holes kept filling with water. When they pumped in the concrete the water of course was displaced but as it overflowed it brought with it some of the concrete, hence we have a thin slurry of concrete under the entire house area. Correction – when handy hubby went to clear up the overflow around the house site he found it wasn’t quite so thin in places, hmmm we may have to consider putting in some alkaline loving plants in those areas. We will also need to punch some holes in the overflow under the house to make sure we don’t get water pooling and creating water traps for mosquitos. Read more